Faruk Kurt
Independent payments architect · Amsterdam

I make one change to a payment flow you already run, at a fee fixed in writing before you sign.

You buy it when a flow that runs needs one thing changed, whether it’s one I built, designed or reviewed, one a Standing Review covers, or any flow of yours.

Price
The fee its proposal states, with no minimum
Duration
In writing within two business days of your description
Access
Working access to the code, development and staging the proposal names

What a Change ends in

Every Change hands over three things, all yours and in accounts in your own name, accepted as a Build is, against pass-or-fail tests we both sign before any code is written:

  • The changed flow, working,in your own repository, development and staging, where its code is kept and tried before it goes live, doing what your description said it must and leaving alone what it said it must not alter; whatever the flow can already tell you about each euro, such as which rule, person or AI agent decided it, it can still tell you after the change
  • The acceptance criteriawritten into the proposal, each worded so it can fail, and every one of them passed.
  • The manual and the written procedures, currentupdated wherever the change touches them, so whoever runs the flow runs the changed one from the same pages, without me

Which flows a Change can be made to, and what it needs from your side

You don’t need engineers of your own, an earlier engagement with me, or a specification: one written description of the change is enough to start.

A flow I built, designed or reviewed for you
the change is made against the decisions already written down for it, so nothing you paid to decide is undone by accident
A flow a Standing Review of mine covers
where a written answer says a change needs code, this is where that code is written, on the same terms as any other Change
Any other flow of yours
whoever or whatever wrote it, whether your own engineers, a supplier you no longer use or an AI, the Change opens with a read of it, named in the proposal and included in the fee, so the change is made against what the flow actually does, and not against a guess
what Bilanx does with your payouts, refunds and deposits, screen by screen

The proposal names who does each step, me included: where you have engineers, their part is set up together with them, and where you don’t, I do it.

The latest project I did for a client, and the one that shows my work best, is the kind of system a Change is made to.

That client’s whole project, from its first paragraph to the handover, walked screen by screen

What you pay, when it’s fixed, and what counts as finished

A Change can’t cost you more than the fee in its proposal, and that fee is in your hands, in writing, within two business days of your description and before you’ve agreed to anything.

Your description
In writing, in your own words: the flow, what the change must do, and what it must not alter.
The proposal
Within two business days of it: the fee, the window, the scheduled acceptance date, and the acceptance criteria, each worded so it can fail. Signing the proposal signs the criteria, so there is no separate sheet, and no code is written against them before then.
The fee
Set against the change you described, with no minimum, and fixed once you sign.

What to forward, and who it’s for

Whoever has to sign the spend, run the criteria or run the flow reads the one proposal, the part written for them, and none of them needs to talk to me first.

me, the person you sign with, and nobody else on the work

I read your description and your flow, write the proposal and its criteria, and write the change, its tests and the pages of the manual and procedures it touches

  • whoever signs the spendthe proposal’s fee, with no minimum and fixed once signed, its dates, and what you owe if you stop
  • whoever runs the criteriathe criteria in the proposal, each worded so it can fail, with what counts as evidence
  • whoever will run the flowthe pages of the manual and the written procedures the change updates

What to send me, and what comes back by when

Send me one short, plain paragraph about the payment flow and the one change you want made to it, saying what the change must do and what it must not alter, with nothing confidential and no specification.

It helps to name who decides on your side, whether I’ve worked on the flow before, and where its code lives now, if you know.

By the end of the next Amsterdam business day, my reply:

  • the first thing I’d check in your flow,
  • whether it’s a Change, or which engagement fits better,
  • and the date the proposal lands

Within two Amsterdam business days of your description, the proposal, in writing: the fee, the window, the scheduled acceptance date and the acceptance criteria;

Or the same paragraph by WhatsApp to +31 6 18652394. A document comes by email.

Or book a 30-minute call here, or ask for one by phone or WhatsApp on +31 6 18652394, and I phone you at the time you pick.